Workflow 01
Quote & estimate
Itemised quotes against a live materials price index, with allowances for council fees, BWoF and producer-statement costs surfaced up front.
Kete means basket or kit. This is the assembl specialist pack for construction work: agents, tools, live knowledge, review rules, and evidence packs.
Fewer reworked consents. Faster council sign-off.. assembl's construction operating layer helps architects, builders, and project teams turn plans, consent evidence, site safety notes, and completion records into review-ready packs. Waihanga is the named pack; the first job is fewer reworked consents and clearer council handoffs.
Industry Pack — NZ$5,000/mo + GST flat.

Waihanga handles the work that sits between the design office and the BCA: consent applications, producer statements, plan checks, site safety paperwork, variation packs, and the evidence trail that ends with a Code Compliance Certificate.
The architecture flow is already in the stack: plan-to-3D analysis, BIM review, NZ Building Code checks, producer-statement scoping, and a council-ready evidence trail. Reviewers see exactly which clause each paragraph stands on. Auditors see the same trail months later.
Waihanga is the first live construction pack because the cost of getting it wrong is visible: every reworked consent is a fortnight of delay. The Pilot Sprint usually starts here.
Pick the task you need: prepare a draft, check the evidence, review the rules, or package the record. The internal agent names stay visible, but the work comes first.
Workflow 01
Itemised quotes against a live materials price index, with allowances for council fees, BWoF and producer-statement costs surfaced up front.
Workflow 02
Generates a complete consent application: PIM, building consent, producer statements, code-compliance evidence — formatted for the relevant TA.
Workflow 03
Drafts PS1 / PS3 / PS4 with the right author, scope, and limitations — flags scope-creep and missing peer-review before submission.
Workflow 04
Site-specific SWMS, hazard register, and toolbox-talk records, kept current as the build phase changes.
Workflow 05
Variation packs with cost, time, and contract impact captured against the original NZS3910/NZS3915 form. RFIs auto-tracked to closure.
Workflow 06
Bundles the full evidence trail for CCC — producer statements, inspections, BWoF schedule — into one auditor-defensible pack.
| Capability | Waihanga | Standard PM tools |
|---|---|---|
| Building Act s 14B consent pack drafting | ||
| Producer statement (PS1/PS3/PS4) generation | ||
| NZS 3910 variation forms | ||
| Site SWMS auto-refresh | ||
| Evidence packs with provenance watermark | ||
| Cost & schedule tracking | Yes | |
| Document storage | Yes | |
| NZ data residency | Sometimes | |
| Cites legislation in outputs |
Pilot Sprint for Waihanga · Construction pack
NZ$5,000 + GST
Two weeks · One workflow · Money-back if no time saved
Pick one consent that has been bouncing back. assembl drafts the s 14B precheck — every Acceptable Solution cited, every producer statement scoped — alongside your designer. By Friday: a precheck pack the BCA has acknowledged.
The Pilot Sprint — NZ$5,000 + GST for two weeks — is the fastest way to see your work drafted, reviewed, and sealed with proof.