Waiting for you
2drafts need your yesArchitecture · built for New Zealand
assembl OS for architecture.
One record for an architecture practice: projects, consent pre-checks by Building Code clause, tenders, site visits and the Studio tools, with five specialists who read official New Zealand pages before they draft.
The shell
Try it on the Example. Nothing here is real.
This is architecture OS running on Lantern Row Architects, a fictional business. Move between the tabs with the arrow keys, and approve a draft to see what changes. Nothing is sent.
assembl OS for architecture
Experimental · built first; the public version runs on an Example practice with live NZ data
ExampleLantern Row Architects · Fictional, Tāmaki Makaurau, Ōtautahi and Pōneke. A made-up practice of about eight people with three projects: a finished reading pavilion, a hall under construction and a house addition in detailed design. Every record here is simulated: no real business, people or data.
Today
SimulatedWhat needs you today: drafts awaiting approval, dates coming up and what the team did overnight.
In draft
4being prepared by the teamSpecialists
5Ata · Rawa · Kaupapa · Ārai · PaiOfficial sources
28last checked 2026-11-08Agent team · in the Example
Who is doing what.
- AtaWatching
BIM and model coordination · Level 2 · Draft
ReadyTurns a clash report or model check into a coordination note: what clashes, which discipline owns it, which Building Code clause an architect should look at.
Reads 9 official sources
Ask Ata
- RawaDrafting
Building consents · Level 2 · Draft
NowLakeside Hall: deck amendment needs an E2 note
Reads 15 official sources
Ask Rawa
- KaupapaDrafting
Project delivery · Level 2 · Draft
NowLakeside Hall: payment claim checklist for this month
Reads 8 official sources
Ask Kaupapa
- ĀraiDrafting
Site health and safety · Level 2 · Draft
NowLakeside Hall: edge protection question for the site manager
Reads 6 official sources
Ask Ārai
- PaiWaiting for you
Quality and inspections · Level 2 · Draft
NowLakeside Hall: site visit report ready to send
Reads 10 official sources
Ask Pai
Waiting for a person · 2
Drafts for your call.
- Awaiting approvalSimulatedRawa
Gully House: energy approach to note before lodging
The pre-check found no H1 method on the record, and the H1 edition to confirm. For the project architect to check.
- DraftSimulatedRawa
Lakeside Hall: deck amendment needs an E2 note
No weathertightness approach on the amendment record yet. Rawa can draft the note for the architect.
- Awaiting approvalSimulatedPai
Lakeside Hall: site visit report ready to send
Three observations with owners. Goes to the contractor, engineer and committee after you approve.
- DraftSimulatedĀrai
Lakeside Hall: edge protection question for the site manager
Drafted from the visit notes and WorkSafe’s working at height guidance.
- DraftSimulatedKaupapa
Lakeside Hall: payment claim checklist for this month
Construction observation stage. For a director to check and send.
- DraftSimulated
New GETS notices to review
Ranked for the practice. A lead to check, not a decision to bid.
Trace · every step
What the team just did.
- Read
Ata Building Act 2004
- Waiting
Pai Lakeside Hall: site visit report ready to send
- Read
Pai Building Act 2004
- Drafted
Ārai Lakeside Hall: edge protection question for the site manager
- Read
Ārai Health and Safety at Work Act 2015
- Drafted
Kaupapa Lakeside Hall: payment claim checklist for this month
- Read
Kaupapa Building Act 2004
Built from the Example’s own tasks and the official sources each specialist cites. Simulated timing.
What this OS does
Live site conditions
Wind, gusts, rain and nearby earthquakes at each project site, fetched live and stamped with the time.
Model values for the site’s grid cell, not a site weather station. Magnitude is not the shaking at the site.
Official sources
No working screen for this module in the Example yet.
The pack
What this OS adds for your industry.
Each module shows what it can do today. Proposed means designed, not built.
Consent pre-check by clause
Reads each project record and flags the Building Code clauses an architect should check before the set is lodged. Rawa drafts the RFI answers.
Flags clauses for an architect to review. It never says a design complies, and the council decides a consent.
Tender hunt
New GETS notices from the last 30 days, ranked for an architecture practice, with a batch of near-identical notices folded into one.
A lead to check, not a recommendation to bid. Open the notice on GETS before acting.
Official sources
Pipeline and fee forecast
Won work in full and the rest by likelihood, month by month against break-even, with the first gap named.
Clash check
Open an IFC model in the browser and find where elements clash. Ata turns the result into a coordination note.
Programme resequencer
Move a task and watch the programme reflow. Kaupapa drafts the change note for the client.
Site terrain and rain flow
Real LINZ LiDAR ground for any New Zealand site, in 3D, with rain to show where water runs and pools.
Live site conditions
Wind, gusts, rain and nearby earthquakes at each project site, fetched live and stamped with the time.
Model values for the site’s grid cell, not a site weather station. Magnitude is not the shaking at the site.
Fees and stages
Each project’s stages, deliverables and how much of each stage has been claimed, as a share of the agreed fee.
Official sources
Site visits
A voice memo from the walk back to the car becomes a site visit report with owners and decisions, held for approval before it goes out.
Consultants
Who is waiting on whom across structural, services, acoustic and the contractor, and the next thing each owes.
Document register
Sheets, revisions and status, with superseded revisions kept visible so nobody builds from an old drawing.
Specialist desk
Ask Ata, Rawa, Kaupapa, Ārai or Pai. Each reads official New Zealand pages live, drafts, then checks its draft against them.
Drafts for a person to check. Not legal advice. Nothing is lodged, sent or notified.
The Workforce
Specialist agents, grounded in official sources.
Workforce is the agent team inside the OS. Each specialist reads official New Zealand pages live, cites the source and date for every claim and fact-checks its own draft. Drafts are not legal advice.
Ata BIM and model coordination
Turns a clash report or model check into a coordination note: what clashes, which discipline owns it, which Building Code clause an architect should look at.
Official sources
- Building Act 2004 (opens in a new tab)
- Building Regulations 1992, Schedule 1: the Building Code (opens in a new tab)
- Building Code compliance (opens in a new tab)
- Different ways to comply (Acceptable Solutions, Verification Methods, alternative solutions) (opens in a new tab)
- Building Code clause B: Stability (opens in a new tab)
- Building Code clause E: Moisture (opens in a new tab)
- Building Code clause H: Energy efficiency (opens in a new tab)
- Building Code clause C: Protection from fire (opens in a new tab)
- Building Code clause D: Access (opens in a new tab)
Rawa Building consents
Prepares a consent set for lodging: a pre-check by Building Code clause, a document checklist and draft answers to council requests for information.
Official sources
- Building Act 2004 (opens in a new tab)
- Building Regulations 1992, Schedule 1: the Building Code (opens in a new tab)
- Building Code compliance (opens in a new tab)
- Different ways to comply (Acceptable Solutions, Verification Methods, alternative solutions) (opens in a new tab)
- Building Code clause B: Stability (opens in a new tab)
- Building Code clause E: Moisture (opens in a new tab)
- Building Code clause H: Energy efficiency (opens in a new tab)
- Building Code clause C: Protection from fire (opens in a new tab)
- Building Code clause D: Access (opens in a new tab)
- Apply for building consent (opens in a new tab)
- Building consent exemptions for low-risk work (opens in a new tab)
- Build to the consent (inspections, amendments, minor variations) (opens in a new tab)
- Code compliance certificate (opens in a new tab)
- Building consent authorities register (opens in a new tab)
- Restricted building work (for LBPs) (opens in a new tab)
Kaupapa Project delivery
Keeps the job moving: programme changes, meeting actions, variation registers and payment-claim checklists under the Construction Contracts Act.
Official sources
- Building Act 2004 (opens in a new tab)
- Construction Contracts Act 2002 (opens in a new tab)
- Health and Safety at Work Act 2015 (opens in a new tab)
- Apply for building consent (opens in a new tab)
- Build to the consent (inspections, amendments, minor variations) (opens in a new tab)
- Code compliance certificate (opens in a new tab)
- Restricted building work (for LBPs) (opens in a new tab)
- About the LBP scheme (opens in a new tab)
Ārai Site health and safety
Prepares for a site visit: the hazards to ask about, the questions for the main contractor, and what a notifiable event would mean, from WorkSafe and the Act.
Official sources
- Health and Safety at Work Act 2015 (opens in a new tab)
- Health and Safety at Work (General Risk and Workplace Management) Regulations 2016 (opens in a new tab)
- Construction (topic and industry guidance) (opens in a new tab)
- Working at height (opens in a new tab)
- Asbestos (opens in a new tab)
- Notify WorkSafe (notifiable events) (opens in a new tab)
Pai Quality and inspections
Turns site observations into a defects list, gets ready for council inspections and checks what a code compliance certificate will need.
Official sources
- Building Act 2004 (opens in a new tab)
- Building Regulations 1992, Schedule 1: the Building Code (opens in a new tab)
- Building Code compliance (opens in a new tab)
- Different ways to comply (Acceptable Solutions, Verification Methods, alternative solutions) (opens in a new tab)
- Building Code clause B: Stability (opens in a new tab)
- Building Code clause E: Moisture (opens in a new tab)
- Build to the consent (inspections, amendments, minor variations) (opens in a new tab)
- Code compliance certificate (opens in a new tab)
- Restricted building work (for LBPs) (opens in a new tab)
- About the LBP scheme (opens in a new tab)
Official New Zealand sources this OS cites
- Building Act 2004 (opens in a new tab)
- Building Regulations 1992, Schedule 1: the Building Code (opens in a new tab)
- Construction Contracts Act 2002 (opens in a new tab)
- Health and Safety at Work Act 2015 (opens in a new tab)
- Health and Safety at Work (General Risk and Workplace Management) Regulations 2016 (opens in a new tab)
- Building Code compliance (opens in a new tab)
- Different ways to comply (Acceptable Solutions, Verification Methods, alternative solutions) (opens in a new tab)
- Building Code clause B: Stability (opens in a new tab)
- Building Code clause E: Moisture (opens in a new tab)
- Building Code clause H: Energy efficiency (opens in a new tab)
- Building Code clause C: Protection from fire (opens in a new tab)
- Building Code clause D: Access (opens in a new tab)
- Apply for building consent (opens in a new tab)
- Building consent exemptions for low-risk work (opens in a new tab)
- Build to the consent (inspections, amendments, minor variations) (opens in a new tab)
- Code compliance certificate (opens in a new tab)
- Building consent authorities register (opens in a new tab)
- Restricted building work (for LBPs) (opens in a new tab)
- About the LBP scheme (opens in a new tab)
- Construction (topic and industry guidance) (opens in a new tab)
- Working at height (opens in a new tab)
- Asbestos (opens in a new tab)
- Notify WorkSafe (notifiable events) (opens in a new tab)
Free tools that feed it
Price
What it would cost when it opens.
Workforce plan
NZ$20 a month
Modules for this OS
Industry packs
+NZ$20 a month
Extra skills and sources for one industry. Architecture first: a consent pre-check by Building Code clause.
Proposed
NZ compliance skills
+NZ$10 a month
Flags what to check in your drafts against the Privacy Act 2020, the Consumer Guarantees Act, food control plans and the Building Act and LBP rules.
Draft · guidance, not legal advice
NZ signals radar
Included in the Workforce plan
Watches public New Zealand signals (tenders, Parliament, regulators) and ranks what matters to your business.
Live · in assembl’s own Pursuit; partial, some feeds are being repaired
HR (Aroha)
+NZ$10 a month
Drafts employment agreements, leave answers and process steps under New Zealand employment law, for your review.
Draft
NZ business lookup
+NZ$10 a month
Looks up a business on the NZBN register and the Companies Office: status, directors and addresses.
Experimental
New Zealand dollars, including GST. This plan is on a waitlist only: nothing monthly can be bought yet. Any 3 modules: pay for 2. The cheapest of every three priced modules you pick is free. (Proposed)
What the labels on this page mean
- Example
- A fictional business. No real client data.
- Simulated
- The screen works on fictional data only.
- Illustrative
- A picture of the idea, not a real screen or result.
- Draft
- Written by an agent for a person to check. Not advice.