Lantern Row Architects is fictionalExample data, live NZ sources
01 Today · Sunday, 8 November 2026
Lantern Row.
assembl OS for architecture, running a fictional practice: three projects, five specialists, live New Zealand data. The practice is made up; the tools, tenders and data are real.
IllustrativeFrom line to life
Lakeside Hall, taking shape
Let the plan rise into a building. Explore its form, reveal the interior, or step into a room.
The room index and project details remain available below.
Use the timeline or select a stage
Example project geometry. Design stages illustrate the proposal, not consent approval or actual construction progress. Room viewpoints are indicative; this is not a measured survey or an automatic drawing-to-model conversion.
Fig. 02Waiting on you
- Awaiting approvalby Rawa
Gully House: energy approach to note before lodging
The pre-check found no H1 method on the record, and the H1 edition to confirm. For the project architect to check.
- Draftby Rawa
Lakeside Hall: deck amendment needs an E2 note
No weathertightness approach on the amendment record yet. Rawa can draft the note for the architect.
- Awaiting approvalby Pai
Lakeside Hall: site visit report ready to send
Three observations with owners. Goes to the contractor, engineer and committee after you approve.
- Draftby Ārai
Lakeside Hall: edge protection question for the site manager
Drafted from the visit notes and WorkSafe’s working at height guidance.
- Draftby Kaupapa
Lakeside Hall: payment claim checklist for this month
Construction observation stage. For a director to check and send.
03 Projects · Example
Three projects, three stages.
A finished reading room with a year of metered energy data, a hall with its frames up, and a house addition heading for consent. Each opens as a drawing set.
All projects
IllustrativeLakeside Hall
A tall gabled hall for 180 people, with a kitchen and stage that open to a deck on the lake side.
IllustrativeReading Pavilion
A single long room for reading, under a mono-pitch timber roof that lifts to the north light.
IllustrativeGully House
A two-storey addition to a 1950s house on a steep gully, stepping down the slope to the sun.
Fig. 04Live at the sites
Loading live conditions
Loading live conditions
Loading live conditions
Fig. 05Consent check
- Lakeside HallE2 · H1
- Gully HouseH1 · H1
The Workforce consent rules read each project record and cite Building Code clauses by number. A flag is a prompt for the architect, never a verdict; the council decides a consent.
Fig. 06New tenders
- GETSBuildingsRefurbishment and consenting
Main Building Contractor for AMS Upgrade & Refurbishment to Block 1 at Winchester Street School
Published 19 Oct 2026 · seen 19 Oct 2026
- GETSBuildings
Published 16 Oct 2026 · seen 16 Oct 2026
- GETSBuildings
RFT for a Main Contractor for a new Hall for Chelsea Primary School
Published 27 Oct 2026 · seen 27 Oct 2026
07 Team · Workforce
Five specialists who read before they write.
Each one fetches building.govt.nz, legislation.govt.nz, the LBP scheme or WorkSafe live, drafts, then checks its own draft against what it read. Authority level 2: Draft.
Ask a specialistExisting assembl agent names, kept with their macrons, awaiting a fluent-speaker review.
Fig. 08Offices
Tāmaki Makaurau · Auckland
Tāmaki Makaurau: time loading
- Zone
- NZ
- Sunrise
- --:--
- Sunset
- --:--
- Sun
- –
36°51′S 174°46′E
Ōtautahi · Christchurch
Ōtautahi: time loading
- Zone
- NZ
- Sunrise
- --:--
- Sunset
- --:--
- Sun
- –
43°32′S 172°38′E
Pōneke · Wellington
Pōneke: time loading
- Zone
- NZ
- Sunrise
- --:--
- Sunset
- --:--
- Sun
- –
41°17′S 174°47′E
Fig. 09Free tools that feed this OS
- admin hours calculatorfree tool
- Huifeeds site visits
- privacy one-pagerfree tool
- holiday pay check · by Arohafree tool