02 Projects / LR-25-007 · Example
Detailed design
Gully House.
IllustrativeThe project
A two-storey addition to a 1950s house on a steep gully, stepping down the slope to the sun.
- Area
- 182 m² GFA
- Year
- 2027 (planned)
- Structure
- Timber frame, steel portal on the slope
- Status
- Detailed design
- Client
- Example private client
- Storeys
- 2
The existing house sits at the top of a gully and turns its back on the sun. The addition steps down the slope on a steel portal so the living rooms face north over the trees.
We started from a measured survey of the existing house, because the 1950s drawings were not reliable. The survey against the base drawings is below: most walls are within 10 mm, two are not.
Detailed design is under way. The consent pre-check has flagged two things for the architect to look at before the set is lodged.
Fig. 02Build state
- Designed: outline in light
- Consented: sparse cloud
Programme
Up to 14 days late ahead · Example
- Brief and measured surveyDone 24 Feb 2025, planned 10 Feb 2025, 14 days late
- Concept optionsDone 18 Aug 2025, planned 4 Aug 2025, 14 days late
- Resource consent grantedDone 18 Mar 2026, planned 27 Feb 2026, 19 days late
- Developed designDone 24 Jul 2026, planned 10 Jul 2026, 14 days late
- Detailed design and consent set (now)Forecast 27 Nov 2026, planned 13 Nov 2026, 14 days late
- Building consent lodgedForecast 15 Feb 2027, planned 1 Feb 2027, 14 days late
- TenderForecast 24 May 2027, planned 10 May 2027, 14 days late
Consent
Building consent authority · Example
Inspections
None yet · Example
No inspections until the building consent is granted. The BCA’s first inspection will be the piles and retaining footings.
Who owes what
NZD excl. GST · Example figures
Payment claims to the client
- Claimed
- $56,400
- Paid
- $49,200
- Outstanding
- $7,200
- Overdue
- $0
- PC-06Detailed design, Oct$7,200Not yet due
- PC-05Detailed design, Aug and Sep$6,000Paid
- PC-04Developed design$17,280Paid
3 earlier claims, all paid ($25,920)
- PC-03Preliminary design$11,520Paid
- PC-02Concept options$9,600Paid
- PC-01Pre-design and the measured survey brief$4,800Paid
We owe consultants
- Invoiced
- $15,650
- Paid
- $11,050
- Outstanding
- $4,600
- Overdue
- $0
- 30 NovStructural engineer: retaining wall and bracing design, to date$4,600Held
- 20 Mar 2025Surveyor: measured survey of the existing house$3,200Paid
- 30 SeptGeotechnical engineer: slope report$7,850Paid
From line to life
Gully House, taking shape
Let the plan rise into a building. Explore its form, reveal the interior, or step into a room.
The room index and project details remain available below.
Use the timeline or select a stage
Example project geometry. Design stages illustrate the proposal, not consent approval or actual construction progress. Room viewpoints are indicative; this is not a measured survey or an automatic drawing-to-model conversion.
Fig. 03Drawing set
- Project
- Gully House
- Project no.
- LR-25-007
- Sheet
- A-101 Ground floor plan
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2026-11-02
- Revision
- B
- Status
- Example practice · demo data
- Project
- Gully House
- Project no.
- LR-25-007
- Sheet
- A-301 Section
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2026-11-02
- Revision
- B
- Status
- Example practice · demo data
- Project
- Gully House
- Project no.
- LR-25-007
- Sheet
- A-201 North elevation
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2026-11-02
- Revision
- B
- Status
- Example practice · demo data
- Project
- Gully House
- Project no.
- LR-25-007
- Sheet
- A-901 Axonometric
- Scale
- NTS
- Drawn by
- LR (example)
- Date
- 2026-11-02
- Revision
- B
- Status
- Example practice · demo data
Fig. 04Measured survey against base drawings
Measured survey of the existing house against the base drawings. Example deviations, drawn 40 times true size.
- Points
- 56
- Within 10 mm
- 44
- Watch, to 25 mm
- 9
- Outside
- 3 · max 38 mm
Drag the handle or use the arrow keys. Circles are within tolerance, diamonds are on watch, and filled marks are outside. Pai turns the outside points into a defects list for the architect.
Fig. 05Consent pre-check
Building consent set for the addition.
Project record only (stage, notes, updates and document list). Building Code clauses cited by number; no Standards text used.
Ask Rawa to draft the notes- H1H1 Energy efficiencyFor architect review
No energy efficiency approach noted (method used, insulation and glazing values).
Next: Note the H1 method used and the insulation and glazing values.
scheduled rules pre-check · not found in the project record
- H1H1 editionFor architect review
The transition period for the superseded H1 edition ends 2026-11-26. If this application will be lodged after that date, check which H1 edition the design was prepared to.
Next: Record which H1 edition the design follows on the project record.
scheduled rules pre-check · transition date 2026-11-26
The 2026-11-26 date is the practice’s own setting in the Workforce rules. Confirm it on building.govt.nz, clause H.
Fig. 06Energy, modelled against target
- Modelled, 12 months
- 49.1 kWh/m²
- Target, 12 months
- 46.6 kWh/m²
- Against target
- +5.4%
- Months over target
- 8 of 12
| Month | Modelled | Target | Difference |
|---|---|---|---|
| Oct 2027 | 3.6 | 3.4 | +0.2 |
| Nov 2027 | 3.0 | 2.9 | +0.1 |
| Dec 2027 | 2.5 | 2.5 | ±0.0 |
| Jan 2028 | 2.3 | 2.4 | −0.1 |
| Feb 2028 | 2.4 | 2.5 | −0.1 |
| Mar 2028 | 2.9 | 2.9 | ±0.0 |
| Apr 2028 | 3.8 | 3.6 | +0.2 |
| May 2028 | 4.9 | 4.6 | +0.3 |
| Jun 2028 | 6.1 | 5.6 | +0.5 |
| Jul 2028 | 6.6 | 6.0 | +0.6 |
| Aug 2028 | 6.2 | 5.7 | +0.5 |
| Sept 2028 | 4.8 | 4.5 | +0.3 |
Fig. 07Fees and stages
Share of the agreed fee claimed so far · Example
58.8%
| Stage | Deliverable | Share of fee | Claimed | Status |
|---|---|---|---|---|
| Pre-design | Brief, site study, programme | 5% | 100% | Claimed |
| Concept design | Options and a preferred concept | 10% | 100% | Claimed |
| Preliminary design | Plans, sections and an outline specification | 12% | 100% | Claimed |
| Developed design | Coordinated design with consultants | 18% | 100% | Claimed |
| Detailed design | Consent and construction set | 25% | 55% | In progress |
| Procurement | Tender documents and tender review | 5% | 0% | Not started |
| Construction observation | Site visits, RFIs, variations and claims | 20% | 0% | Not started |
| Completion | Practical completion, defects and CCC support | 5% | 0% | Not started |
Stage names are the generic sequence New Zealand practices use. Shares and progress are Example figures; there are no prices on this page.
Fig. 09Consultants
| Role | Who (Example) | Stage | Next | Ball in court |
|---|---|---|---|---|
| Structural engineer | Example structural engineer | Detailed design | Retaining wall and bracing design | Waiting on them |
| Geotechnical engineer | Example geotechnical engineer | Report issued | Available for the retaining wall review | Nothing outstanding |
| Surveyor | Example measured survey | Complete | Survey issued | Nothing outstanding |
Fig. 10Document register
| Sheet | Title | Rev | Status | Date |
|---|---|---|---|---|
| A-001 | Cover and drawing list | B | For coordination | 2 Nov 2026 |
| A-101 | Lower floor plan | B | For coordination | 2 Nov 2026 |
| A-102 | Upper floor plan | B | For coordination | 2 Nov 2026 |
| A-401 | Cladding junction details | A | For coordination | 28 Oct 2026 |
| GEO-01 | Geotechnical report | 1 | Issued | 15 Sept 2026 |
Fig. 11Programme
- Feb 2025Brief and measured survey
- Aug 2025Concept options
- Mar 2026Resource consent granted
- Jul 2026Developed design
- Nov 2026Detailed design and consent set (now)
- Feb 2027Building consent lodged
- May 2027Tender
Fig. 12Materials by embodied share
- Steel portal and connections24%
- Concrete piles and retaining22%
- Timber framing and linings17%
- Glazing and frames14%
- Cladding and roofing12%
- Insulation and membranes6%
- Other5%
Fig. 13Site terrain
The ground is real: LINZ’s 1 m elevation model at Wellington Botanic Garden, a public place used as the example site. No building is proposed there.
Studio tool: /lab/site, with rain to show where water runs and pools.
Fig. 14Lessons
- Measure the existing house before concept design. Two walls were out by more than 20 mm against the old drawings.
- Bring the geotechnical engineer to the first site visit on a steep site, not after concept.
- Show the client the section through the gully early; it explained the steel portal better than any plan.
Fig. 15Credits
- Architect
- Lantern Row Architects (example)
- Client
- Example private client
- Structural engineer
- Example structural engineer
- Geotechnical engineer
- Example geotechnical engineer
- Surveyor
- Example measured survey