02 Projects / LR-23-014 · Example

Complete · in use

Reading Pavilion.

Study model of a long timber pavilion with a roof that lifts to a high clerestoryIllustrative
Fig. 01 / Public reading roomGenerated study-model image, not the building

The project

A single long room for reading, under a mono-pitch timber roof that lifts to the north light.

Area
216 m² GFA
Year
2025
Structure
CLT roof on glulam frame
Status
Complete · in use
Client
Example community trust
Storeys
1

The brief asked for a quiet room that a small trust could run with one staff member. We kept it to one volume: a reading room with the services in a thin band along the east side, so a single person at the desk can see every seat.

The roof is cross-laminated timber on three glulam frames on grids A to D. It lifts to the north so the clerestory brings in winter sun and keeps out the summer sun under a deep eave. The slab is exposed and carries the heat into the evening.

Twelve months of metered data now sit against the energy target from the design stage. Most months are under target; winter heating ran over in the first July while the controls were tuned.

Fig. 02Build state

Example · as at 8 Nov 2026 · consent, inspections, money, programme

Reading Pavilion: axonometric massing, shown while the build model loads

Reading Pavilion · Example point-cloud model from the project geometry · as at 8 Nov 2026

The house assembles in build order, then each part settles into where it is at. Drag the model or use the buttons to turn it; pick a card or a part to find it.

  • Complete: dense, shimmering

Programme

On time ahead · Example

  1. Brief and site studyDone 12 Apr 2023, planned 3 Apr 2023, 9 days late
  2. Concept design approvedDone 11 Sept 2023, planned 28 Aug 2023, 14 days late
  3. Building consent grantedDone 12 Feb 2024, planned 29 Jan 2024, 14 days late
  4. On siteDone 13 May 2024, planned 6 May 2024, 7 days late
  5. Roof onDone 13 Sept 2024, planned 2 Sept 2024, 11 days late
  6. Practical completionDone 14 Mar 2025, planned 28 Feb 2025, 14 days late
  7. Code compliance certificateDone 23 Apr 2025, planned 15 Apr 2025, 8 days late
  8. Twelve months of metered dataDone 30 Sept 2026, planned 30 Sept 2026, on time
  9. Post-occupancy review (now)Forecast 8 Dec 2026, planned 8 Dec 2026, on time

Building consent authority · Example

Inspections

12 done · 1 failed · 0 to come · Example

  • Final inspectionSite worksPassed
  • Linings and bracing fixings (post-line)Interior fit-outPassed
  • Insulation (pre-line)Walls and claddingPassed
9 earlier inspections
  • Plumbing (pre-line)ServicesPassed
  • Windows and flashings (pre-clad)Windows and doorsPassed
  • Cavity and wrap (pre-clad)Walls and claddingPassed
  • Roof underlay (pre-roofing)CLT roofPassed
  • Framing and bracing (pre-wrap)Glulam framePassed
  • Slab (pre-pour), re-inspectionSlab and footingsPassed
  • Slab (pre-pour)Slab and footings · Damp-proof membrane joints not taped at the east thickening. Re-inspect before the pour.Failed
  • In-ground drainageServicesPassed
  • Footings (pre-pour)Slab and footingsPassed

Who owes what

NZD excl. GST · Example figures

Payment claims to the client

Claimed
$147,000
Paid
$145,500
Outstanding
$1,500
Overdue
$0
  • PC-11Defects period close-outOur fee · issued 28 Oct · due 25 Nov$1,500Not yet due
  • PC-10Practical completion and CCC supportOur fee · issued 2 May 2025 · due 20 May 2025$3,000Paid
  • PC-09Construction observation, Jan to MarOur fee · issued 4 Apr 2025 · due 22 Apr 2025$10,000Paid
8 earlier claims, all paid ($132,500)
  • PC-08Construction observation, Sep to DecOur fee · issued 10 Jan 2025 · due 28 Jan 2025$10,000Paid
  • PC-07Construction observation, May to AugOur fee · issued 2 Sept 2024 · due 20 Sept 2024$10,000Paid
  • PC-06Tender and tender reviewOur fee · issued 15 Mar 2024 · due 2 Apr 2024$7,500Paid
  • PC-05Detailed design and consent setOur fee · issued 8 Nov 2023 · due 24 Nov 2023$37,500Paid
  • PC-04Developed designOur fee · issued 20 Oct 2023 · due 7 Nov 2023$27,000Paid
  • PC-03Preliminary designOur fee · issued 2 Oct 2023 · due 20 Oct 2023$18,000Paid
  • PC-02Concept designOur fee · issued 15 Sept 2023 · due 2 Oct 2023$15,000Paid
  • PC-01Pre-designOur fee · issued 2 May 2023 · due 20 May 2023$7,500Paid

We owe consultants

Invoiced
$3,100
Paid
$1,200
Outstanding
$1,900
Overdue
$0
  • 10 DecBuilding services: heating trend logs for the post-occupancy reviewExample services engineer$1,900Due
  • 15 Apr 2025Structural engineer: construction review and PS4Example structural engineer$1,200Paid

From line to life

Reading Pavilion, taking shape

Let the plan rise into a building. Explore its form, reveal the interior, or step into a room.

01Sketch
Preparing the building…

The room index and project details remain available below.

Use the timeline or select a stage

Example project geometry. Design stages illustrate the proposal, not consent approval or actual construction progress. Room viewpoints are indicative; this is not a measured survey or an automatic drawing-to-model conversion.

Fig. 03Drawing set

Drawn from the project geometry · grids A–D, 1–7 · rev C

Reading Pavilion: ground floor plan on grids A to D and 1 to 7, 18 by 12 metres.ABCD1234567READING ROOM144 m²CHILDREN'S CORNER36 m²WORKROOM21 m²WC8 m²STORE8 m²60006000600018000 overall12000N0125mGROUND FLOOR PLAN · 1:100 AT A1
Project
Reading Pavilion
Project no.
LR-23-014
Sheet
A-101 Ground floor plan
Scale
1:100 at A1
Drawn by
LR (example)
Date
2025-03-14
Revision
C
Status
Example practice · demo data

Fig. 04As-built survey against design

Example deviations · drawn 40 times true size

As-built laser survey of the walls against the design plan. Example deviations, drawn 40 times true size.

Points
80
Within 10 mm
66
Watch, to 25 mm
12
Outside
2 · max 35 mm

Drag the handle or use the arrow keys. Circles are within tolerance, diamonds are on watch, and filled marks are outside. Pai turns the outside points into a defects list for the architect.

Reading Pavilion: designABCD1234567READING ROOM144 m²CHILDREN'S CORNER36 m²WORKROOM21 m²WC8 m²STORE8 m²60006000600018000 overall12000N0125mGROUND FLOOR PLAN · 1:100 AT A1
As-built survey of Reading Pavilion: example deviations from the design at 80 points along the outer walls.ABCD1234567+35 mmAS-BUILT SURVEY · EXAMPLE DEVIATIONS ×40

Fig. 06Energy, measured against target

Sept 2025 onwards · kWh/m² · Example

Measured, 12 months
52.1 kWh/m²
Target, 12 months
51.0 kWh/m²
Against target
+2.2%
Months over target
4 of 12
Measured energy use against target by month, Sept 2025 to Aug 2026. Measured 52.1 against a target of 51.0 kWh/m². Example data. The table below has the same figures.02468SeptNovJanMarMayJulkWh/m²MeasuredTarget
Measured and target energy use by month, kWh/m². Example data.
MonthMeasuredTargetDifference
Sept 20254.14.3−0.2
Oct 20253.63.8−0.2
Nov 20253.23.4−0.2
Dec 20253.03.2−0.2
Jan 20262.93.1−0.2
Feb 20263.13.2−0.1
Mar 20263.63.6±0.0
Apr 20264.44.4±0.0
May 20265.35.2+0.1
Jun 20266.45.8+0.6
Jul 20266.95.9+1.0
Aug 20265.65.1+0.5

Fig. 07Fees and stages

Kaupapa · Example · shares of the agreed fee

Share of the agreed fee claimed so far · Example

98%

StageDeliverableShare of feeClaimedStatus
Pre-designBrief, site study, programme5%
100%
Claimed
Concept designOptions and a preferred concept10%
100%
Claimed
Preliminary designPlans, sections and an outline specification12%
100%
Claimed
Developed designCoordinated design with consultants18%
100%
Claimed
Detailed designConsent and construction set25%
100%
Claimed
ProcurementTender documents and tender review5%
100%
Claimed
Construction observationSite visits, RFIs, variations and claims20%
100%
Claimed
CompletionPractical completion, defects and CCC support5%
60%
In progress

Stage names are the generic sequence New Zealand practices use. Shares and progress are Example figures; there are no prices on this page.

Fig. 09Consultants

Kaupapa · Example

RoleWho (Example)StageNextBall in court
Structural engineerExample structural engineerCompletePS4 on fileNothing outstanding
Building servicesExample services engineerPost-occupancyHeating control trend logs for the reviewWaiting on them
Main contractorExample builderDefects period endedNothing outstandingNothing outstanding

Fig. 10Document register

Superseded revisions stay visible

SheetTitleRevStatusDate
A-001Cover and drawing listCAs-built14 Mar 2025
A-101Ground floor planCAs-built14 Mar 2025
A-201North and south elevationsCAs-built14 Mar 2025
A-301Section A–A through reading roomCAs-built14 Mar 2025
OM-01Operation and maintenance manualAIssued20 Mar 2025

Fig. 11Programme

Example

  1. Apr 2023Brief and site study
  2. Sept 2023Concept design approved
  3. Feb 2024Building consent granted
  4. May 2024On site
  5. Mar 2025Practical completion
  6. Sept 2026Twelve months of metered data
  7. Dec 2026Post-occupancy review (now)

Fig. 12Materials by embodied share

Example

  • CLT roof panels29%
  • Concrete slab and footings27%
  • Glulam frame12%
  • Glazing and frames12%
  • Timber cladding8%
  • Insulation and membranes6%
  • Other6%

Fig. 13Site terrain

Real LINZ LiDAR · example site at a public place

The ground is real: LINZ’s 1 m elevation model at Auckland Domain, a public place used as the example site. No building is proposed there.

Studio tool: /lab/site, with rain to show where water runs and pools.

LINZ 1 m elevation · Auckland Domain

A 3D model of the real ground, with rain to show where water runs and pools. It downloads elevation tiles when it opens.

Open full screen

Fig. 14Lessons

Kept for the next project

  • Commission the heating controls through a full winter month before handover, not at handover.
  • The deep north eave works: no blinds were needed on the clerestory in the first summer.
  • Leave the exposed slab unsealed for six weeks before the finish coat; the first coat lifted in two bays.
  • One staff member can run the room because the desk sees every seat. Keep the sightline in any change.

Fig. 15Credits

All Example

Architect
Lantern Row Architects (example)
Client
Example community trust
Structural engineer
Example structural engineer
Building services
Example services engineer
Main contractor
Example builder
Quantity surveyor
Example QS