02 Projects / LR-23-014 · Example
Complete · in use
Reading Pavilion.
IllustrativeThe project
A single long room for reading, under a mono-pitch timber roof that lifts to the north light.
- Area
- 216 m² GFA
- Year
- 2025
- Structure
- CLT roof on glulam frame
- Status
- Complete · in use
- Client
- Example community trust
- Storeys
- 1
The brief asked for a quiet room that a small trust could run with one staff member. We kept it to one volume: a reading room with the services in a thin band along the east side, so a single person at the desk can see every seat.
The roof is cross-laminated timber on three glulam frames on grids A to D. It lifts to the north so the clerestory brings in winter sun and keeps out the summer sun under a deep eave. The slab is exposed and carries the heat into the evening.
Twelve months of metered data now sit against the energy target from the design stage. Most months are under target; winter heating ran over in the first July while the controls were tuned.
Fig. 02Build state
- Complete: dense, shimmering
Programme
On time ahead · Example
- Brief and site studyDone 12 Apr 2023, planned 3 Apr 2023, 9 days late
- Concept design approvedDone 11 Sept 2023, planned 28 Aug 2023, 14 days late
- Building consent grantedDone 12 Feb 2024, planned 29 Jan 2024, 14 days late
- On siteDone 13 May 2024, planned 6 May 2024, 7 days late
- Roof onDone 13 Sept 2024, planned 2 Sept 2024, 11 days late
- Practical completionDone 14 Mar 2025, planned 28 Feb 2025, 14 days late
- Code compliance certificateDone 23 Apr 2025, planned 15 Apr 2025, 8 days late
- Twelve months of metered dataDone 30 Sept 2026, planned 30 Sept 2026, on time
- Post-occupancy review (now)Forecast 8 Dec 2026, planned 8 Dec 2026, on time
Consent
Building consent authority · Example
Inspections
12 done · 1 failed · 0 to come · Example
- Final inspectionPassed
- Linings and bracing fixings (post-line)Passed
- Insulation (pre-line)Passed
9 earlier inspections
- Plumbing (pre-line)Passed
- Windows and flashings (pre-clad)Passed
- Cavity and wrap (pre-clad)Passed
- Roof underlay (pre-roofing)Passed
- Framing and bracing (pre-wrap)Passed
- Slab (pre-pour), re-inspectionPassed
- Slab (pre-pour)Failed
- In-ground drainagePassed
- Footings (pre-pour)Passed
Who owes what
NZD excl. GST · Example figures
Payment claims to the client
- Claimed
- $147,000
- Paid
- $145,500
- Outstanding
- $1,500
- Overdue
- $0
- PC-11Defects period close-out$1,500Not yet due
- PC-10Practical completion and CCC support$3,000Paid
- PC-09Construction observation, Jan to Mar$10,000Paid
8 earlier claims, all paid ($132,500)
- PC-08Construction observation, Sep to Dec$10,000Paid
- PC-07Construction observation, May to Aug$10,000Paid
- PC-06Tender and tender review$7,500Paid
- PC-05Detailed design and consent set$37,500Paid
- PC-04Developed design$27,000Paid
- PC-03Preliminary design$18,000Paid
- PC-02Concept design$15,000Paid
- PC-01Pre-design$7,500Paid
We owe consultants
- Invoiced
- $3,100
- Paid
- $1,200
- Outstanding
- $1,900
- Overdue
- $0
- 10 DecBuilding services: heating trend logs for the post-occupancy review$1,900Due
- 15 Apr 2025Structural engineer: construction review and PS4$1,200Paid
From line to life
Reading Pavilion, taking shape
Let the plan rise into a building. Explore its form, reveal the interior, or step into a room.
The room index and project details remain available below.
Use the timeline or select a stage
Example project geometry. Design stages illustrate the proposal, not consent approval or actual construction progress. Room viewpoints are indicative; this is not a measured survey or an automatic drawing-to-model conversion.
Fig. 03Drawing set
- Project
- Reading Pavilion
- Project no.
- LR-23-014
- Sheet
- A-101 Ground floor plan
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2025-03-14
- Revision
- C
- Status
- Example practice · demo data
- Project
- Reading Pavilion
- Project no.
- LR-23-014
- Sheet
- A-301 Section
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2025-03-14
- Revision
- C
- Status
- Example practice · demo data
- Project
- Reading Pavilion
- Project no.
- LR-23-014
- Sheet
- A-201 North elevation
- Scale
- 1:100 at A1
- Drawn by
- LR (example)
- Date
- 2025-03-14
- Revision
- C
- Status
- Example practice · demo data
- Project
- Reading Pavilion
- Project no.
- LR-23-014
- Sheet
- A-901 Axonometric
- Scale
- NTS
- Drawn by
- LR (example)
- Date
- 2025-03-14
- Revision
- C
- Status
- Example practice · demo data
Fig. 04As-built survey against design
As-built laser survey of the walls against the design plan. Example deviations, drawn 40 times true size.
- Points
- 80
- Within 10 mm
- 66
- Watch, to 25 mm
- 12
- Outside
- 2 · max 35 mm
Drag the handle or use the arrow keys. Circles are within tolerance, diamonds are on watch, and filled marks are outside. Pai turns the outside points into a defects list for the architect.
Fig. 06Energy, measured against target
- Measured, 12 months
- 52.1 kWh/m²
- Target, 12 months
- 51.0 kWh/m²
- Against target
- +2.2%
- Months over target
- 4 of 12
| Month | Measured | Target | Difference |
|---|---|---|---|
| Sept 2025 | 4.1 | 4.3 | −0.2 |
| Oct 2025 | 3.6 | 3.8 | −0.2 |
| Nov 2025 | 3.2 | 3.4 | −0.2 |
| Dec 2025 | 3.0 | 3.2 | −0.2 |
| Jan 2026 | 2.9 | 3.1 | −0.2 |
| Feb 2026 | 3.1 | 3.2 | −0.1 |
| Mar 2026 | 3.6 | 3.6 | ±0.0 |
| Apr 2026 | 4.4 | 4.4 | ±0.0 |
| May 2026 | 5.3 | 5.2 | +0.1 |
| Jun 2026 | 6.4 | 5.8 | +0.6 |
| Jul 2026 | 6.9 | 5.9 | +1.0 |
| Aug 2026 | 5.6 | 5.1 | +0.5 |
Fig. 07Fees and stages
Share of the agreed fee claimed so far · Example
98%
| Stage | Deliverable | Share of fee | Claimed | Status |
|---|---|---|---|---|
| Pre-design | Brief, site study, programme | 5% | 100% | Claimed |
| Concept design | Options and a preferred concept | 10% | 100% | Claimed |
| Preliminary design | Plans, sections and an outline specification | 12% | 100% | Claimed |
| Developed design | Coordinated design with consultants | 18% | 100% | Claimed |
| Detailed design | Consent and construction set | 25% | 100% | Claimed |
| Procurement | Tender documents and tender review | 5% | 100% | Claimed |
| Construction observation | Site visits, RFIs, variations and claims | 20% | 100% | Claimed |
| Completion | Practical completion, defects and CCC support | 5% | 60% | In progress |
Stage names are the generic sequence New Zealand practices use. Shares and progress are Example figures; there are no prices on this page.
Fig. 09Consultants
| Role | Who (Example) | Stage | Next | Ball in court |
|---|---|---|---|---|
| Structural engineer | Example structural engineer | Complete | PS4 on file | Nothing outstanding |
| Building services | Example services engineer | Post-occupancy | Heating control trend logs for the review | Waiting on them |
| Main contractor | Example builder | Defects period ended | Nothing outstanding | Nothing outstanding |
Fig. 10Document register
| Sheet | Title | Rev | Status | Date |
|---|---|---|---|---|
| A-001 | Cover and drawing list | C | As-built | 14 Mar 2025 |
| A-101 | Ground floor plan | C | As-built | 14 Mar 2025 |
| A-201 | North and south elevations | C | As-built | 14 Mar 2025 |
| A-301 | Section A–A through reading room | C | As-built | 14 Mar 2025 |
| OM-01 | Operation and maintenance manual | A | Issued | 20 Mar 2025 |
Fig. 11Programme
- Apr 2023Brief and site study
- Sept 2023Concept design approved
- Feb 2024Building consent granted
- May 2024On site
- Mar 2025Practical completion
- Sept 2026Twelve months of metered data
- Dec 2026Post-occupancy review (now)
Fig. 12Materials by embodied share
- CLT roof panels29%
- Concrete slab and footings27%
- Glulam frame12%
- Glazing and frames12%
- Timber cladding8%
- Insulation and membranes6%
- Other6%
Fig. 13Site terrain
The ground is real: LINZ’s 1 m elevation model at Auckland Domain, a public place used as the example site. No building is proposed there.
Studio tool: /lab/site, with rain to show where water runs and pools.
Fig. 14Lessons
- Commission the heating controls through a full winter month before handover, not at handover.
- The deep north eave works: no blinds were needed on the clerestory in the first summer.
- Leave the exposed slab unsealed for six weeks before the finish coat; the first coat lifted in two bays.
- One staff member can run the room because the desk sees every seat. Keep the sightline in any change.
Fig. 15Credits
- Architect
- Lantern Row Architects (example)
- Client
- Example community trust
- Structural engineer
- Example structural engineer
- Building services
- Example services engineer
- Main contractor
- Example builder
- Quantity surveyor
- Example QS