Skip to main content
Skip to content
assemblarchitecture OS

Lantern Row Architects is fictionalExample data, live NZ sourcesNothing here sends, lodges or publishes

Index · assembl OS for architecture · Example practice · demo data

Offices · New Zealand time

  • Tāmaki Makaurau · Auckland

    Tāmaki Makaurau: time loading

    Zone
    NZ
    Sunrise
    --:--
    Sunset
    --:--
  • Ōtautahi · Christchurch

    Ōtautahi: time loading

    Zone
    NZ
    Sunrise
    --:--
    Sunset
    --:--
  • Pōneke · Wellington

    Pōneke: time loading

    Zone
    NZ
    Sunrise
    --:--
    Sunset
    --:--

03 Consent check · Rawa

Consent check.

Before a set is lodged, the Workforce consent rules read each project record and flag the Building Code clauses an architect should check, by number.

Rules, not a model: the same check runs every time, on the project record only. A flag is a prompt for the architect. Nothing here says a design complies, and nothing is lodged; the council, as building consent authority, decides.

Fig. 03.1By clause

2 projects at a consent stage · Example

ClauseCheckProjects flagged
E2E2 External moistureLakeside Hall
H1H1 editionLakeside Hall, Gully House
H1H1 Energy efficiencyGully House

Fig. 03.2Lakeside Hall

consent · For architect review

Amendment to building consent for the wider lake-side deck.

On the record

Amendment for the lake-side deck extension. Structural engineer's PS1 for the deck framing is attached. Insulation R-values unchanged from the granted consent; H1 calculation method used.

Documents: Amendment drawings A-201 to A-215; Specification section 04: deck; Engineer PS1: deck framing.

  • E2
    E2 External moistureFor architect review

    No weathertightness approach noted (risk assessment, cladding, cavity and flashing details).

    Next: Note the weathertightness approach: risk assessment, cladding, cavity and flashing details.

    scheduled rules pre-check · not found in the project record

  • H1
    H1 editionFor architect review

    The transition period for the superseded H1 edition ends 2026-11-26. If this application will be lodged after that date, check which H1 edition the design was prepared to.

    Next: Record which H1 edition the design follows on the project record.

    scheduled rules pre-check · transition date 2026-11-26

    The 2026-11-26 date is the practice’s own setting in the Workforce rules. Confirm it on building.govt.nz, clause H.

Fig. 03.3Gully House

detailed · For architect review

Building consent set for the addition.

On the record

Alterations and a two-storey addition on a steep site. Geotech report on the slope received; structural engineer engaged for the retaining wall and bracing. Vertical shiplap cladding on a 20 mm drained cavity with head flashings.

Documents: Developed design set; Geotechnical report; Measured survey of the existing house.

  • H1
    H1 Energy efficiencyFor architect review

    No energy efficiency approach noted (method used, insulation and glazing values).

    Next: Note the H1 method used and the insulation and glazing values.

    scheduled rules pre-check · not found in the project record

  • H1
    H1 editionFor architect review

    The transition period for the superseded H1 edition ends 2026-11-26. If this application will be lodged after that date, check which H1 edition the design was prepared to.

    Next: Record which H1 edition the design follows on the project record.

    scheduled rules pre-check · transition date 2026-11-26

    The 2026-11-26 date is the practice’s own setting in the Workforce rules. Confirm it on building.govt.nz, clause H.

Fig. 03.9Not checked

Outside the consent stages

  • Reading PavilionComplete · in use

Fig. 03.10Where the clauses live

Official pages · checked 8 Nov 2026