03 Consent check · Rawa
Consent check.
Before a set is lodged, the Workforce consent rules read each project record and flag the Building Code clauses an architect should check, by number.
Rules, not a model: the same check runs every time, on the project record only. A flag is a prompt for the architect. Nothing here says a design complies, and nothing is lodged; the council, as building consent authority, decides.
Fig. 03.1By clause
| Clause | Check | Projects flagged |
|---|---|---|
| E2 | E2 External moisture | Lakeside Hall |
| H1 | H1 edition | Lakeside Hall, Gully House |
| H1 | H1 Energy efficiency | Gully House |
Fig. 03.2Lakeside Hall
Amendment to building consent for the wider lake-side deck.
On the record
Amendment for the lake-side deck extension. Structural engineer's PS1 for the deck framing is attached. Insulation R-values unchanged from the granted consent; H1 calculation method used.
Documents: Amendment drawings A-201 to A-215; Specification section 04: deck; Engineer PS1: deck framing.
- E2E2 External moistureFor architect review
No weathertightness approach noted (risk assessment, cladding, cavity and flashing details).
Next: Note the weathertightness approach: risk assessment, cladding, cavity and flashing details.
scheduled rules pre-check · not found in the project record
- H1H1 editionFor architect review
The transition period for the superseded H1 edition ends 2026-11-26. If this application will be lodged after that date, check which H1 edition the design was prepared to.
Next: Record which H1 edition the design follows on the project record.
scheduled rules pre-check · transition date 2026-11-26
The 2026-11-26 date is the practice’s own setting in the Workforce rules. Confirm it on building.govt.nz, clause H.
Fig. 03.3Gully House
Building consent set for the addition.
On the record
Alterations and a two-storey addition on a steep site. Geotech report on the slope received; structural engineer engaged for the retaining wall and bracing. Vertical shiplap cladding on a 20 mm drained cavity with head flashings.
Documents: Developed design set; Geotechnical report; Measured survey of the existing house.
- H1H1 Energy efficiencyFor architect review
No energy efficiency approach noted (method used, insulation and glazing values).
Next: Note the H1 method used and the insulation and glazing values.
scheduled rules pre-check · not found in the project record
- H1H1 editionFor architect review
The transition period for the superseded H1 edition ends 2026-11-26. If this application will be lodged after that date, check which H1 edition the design was prepared to.
Next: Record which H1 edition the design follows on the project record.
scheduled rules pre-check · transition date 2026-11-26
The 2026-11-26 date is the practice’s own setting in the Workforce rules. Confirm it on building.govt.nz, clause H.
Fig. 03.9Not checked
- Reading PavilionComplete · in use
Fig. 03.10Where the clauses live
- Building Regulations 1992, Schedule 1: the Building CodeNZ Legislation
- Different ways to comply (Acceptable Solutions, Verification Methods, alternative solutions)Building Performance (MBIE)
- Building Code clause B: StabilityBuilding Performance (MBIE)
- Building Code clause E: MoistureBuilding Performance (MBIE)
- Building Code clause H: Energy efficiencyBuilding Performance (MBIE)
- Building Code clause C: Protection from fireBuilding Performance (MBIE)
- Building Code clause D: AccessBuilding Performance (MBIE)