02 Projects / LR-24-031 · Example

Under construction

Lakeside Hall.

Study model of a gabled timber hall with its frames exposed at one end, beside a lakeIllustrative
Fig. 01 / Community hallGenerated study-model image, not the building

The project

A tall gabled hall for 180 people, with a kitchen and stage that open to a deck on the lake side.

Area
336 m² GFA
Year
2027 (planned)
Structure
Glulam portal frames
Status
Under construction
Client
Example hall committee
Storeys
1

The hall replaces a tired 1960s building on the same footprint. The committee wanted one big room that could hold a wedding, a sports night and a polling day, and that the town could still afford to heat.

Seven glulam portal frames span the hall on grids 1 to 7. The services sit in a lower block on grid D: stage, kitchen, foyer and toilets, so the tall room stays clear.

The frame is up. The progress scan of the frame and slab sits against the design below, and an amendment to the consent for a wider deck is with the architect for review.

Fig. 02Build state

Example · as at 8 Nov 2026 · consent, inspections, money, programme

Lakeside Hall: axonometric massing, shown while the build model loads

Lakeside Hall · Example point-cloud model from the project geometry · as at 8 Nov 2026

The house assembles in build order, then each part settles into where it is at. Drag the model or use the buttons to turn it; pick a card or a part to find it.

  • Consented: sparse cloud
  • Built so far: settled
  • Still to build: drifting in
  • Inspected: scan passing
  • Complete: dense, shimmering
  • On hold: frozen mid-air
  • Failed inspection: off true

Programme

Up to 21 days late ahead · Example

  1. Brief with the hall committeeDone 10 Jun 2024, planned 10 Jun 2024, on time
  2. Developed designDone 29 Nov 2024, planned 15 Nov 2024, 14 days late
  3. Building consent grantedDone 10 Jul 2025, planned 20 Jun 2025, 20 days late
  4. On siteDone 9 Mar 2026, planned 23 Feb 2026, 14 days late
  5. Frame upDone 20 Oct 2026, planned 28 Sept 2026, 22 days late
  6. Deck amendment to consent (now)Forecast 20 Nov 2026, planned 6 Nov 2026, 14 days late
  7. Roof closed inForecast 18 Dec 2026, planned 4 Dec 2026, 14 days late
  8. Practical completionForecast 30 Apr 2027, planned 9 Apr 2027, 21 days late

Building consent authority · Example

Inspections

5 done · 2 failed · 3 to come · Example

  • Portal frames, re-inspectionGlulam portal frames · Once the C/3 bolts are in and the engineer has signed off A/1.Booked
  • Cavity and wrap (pre-clad)Walls and cladding · Services block walls first.Booked
  • Insulation and plumbing (pre-line)Services · After the roof is on and the walls are wrapped.To book
  • Portal frames and bracingGlulam portal frames · Two bolts missing at the knee connection C/3. Base plate at A/1 is 28 mm off set-out; the engineer to confirm before grouting.Failed
  • Slab (pre-pour), re-inspectionSlab and footingsPassed
  • Slab (pre-pour)Slab and footings · Under-slab insulation not continuous at the services block edge; two reinforcing chairs missing in bay D/6.Failed
2 earlier inspections
  • In-ground drainageServicesPassed
  • Footings (pre-pour)Slab and footingsPassed

Who owes what

NZD excl. GST · Example figures

Payment claims to the client

Claimed
$1,186,100
Paid
$989,050
Outstanding
$197,050
Overdue
$7,200
  • PC-09Construction observation, OctOur fee · issued 3 Nov · due 20 Nov$2,400Not yet due
  • C-07Frames 5 to 7, purlins on grids 1 to 4Builder’s claim, certified by us · issued 31 Oct · due 20 Nov$187,450Not yet due
  • PC-08Construction observation, Jul to SepOur fee · issued 2 Oct · due 20 Oct · 19 days late$7,200Overdue
13 earlier claims, all paid ($989,050)
  • C-06Frames 1 to 4 erectedBuilder’s claim, certified by us · issued 30 Sept · due 20 Oct$164,300Paid
  • C-05Frame delivery and first liftsBuilder’s claim, certified by us · issued 31 Aug · due 21 Sept$118,900Paid
  • C-04Glulam frames, made off siteBuilder’s claim, certified by us · issued 31 Jul · due 20 Aug$210,000Paid
  • PC-07Construction observation, Mar to JunOur fee · issued 3 Jul · due 20 Jul$9,600Paid
  • C-03Services block slabBuilder’s claim, certified by us · issued 30 Jun · due 20 Jul$61,750Paid
  • C-02Hall slab and in-ground servicesBuilder’s claim, certified by us · issued 29 May · due 19 Jun$148,300Paid
  • C-01Site establishment and footingsBuilder’s claim, certified by us · issued 30 Apr · due 20 May$96,200Paid
  • PC-06Tender and tender reviewOur fee · issued 12 Dec 2025 · due 16 Jan$12,000Paid
  • PC-05Detailed design and consent setOur fee · issued 11 Apr 2025 · due 28 Apr 2025$60,000Paid
  • PC-04Developed designOur fee · issued 6 Dec 2024 · due 20 Dec 2024$43,200Paid
  • PC-03Preliminary designOur fee · issued 11 Oct 2024 · due 28 Oct 2024$28,800Paid
  • PC-02Concept designOur fee · issued 6 Sept 2024 · due 23 Sept 2024$24,000Paid
  • PC-01Pre-designOur fee · issued 5 Jul 2024 · due 22 Jul 2024$12,000Paid

We owe consultants

Invoiced
$18,050
Paid
$9,800
Outstanding
$8,250
Overdue
$5,400
  • 5 NovStructural engineer: deck framing design and PS1Example structural engineer · 3 days late · Approved; in this week’s payment run$5,400Overdue
  • 15 NovAcoustic engineer: ceiling layout reviewExample acoustic consultant$2,850Due
  • 30 Apr 2025Structural engineer: consent documentationExample structural engineer$9,800Paid

From line to life

Lakeside Hall, taking shape

Let the plan rise into a building. Explore its form, reveal the interior, or step into a room.

01Sketch
Preparing the building…

The room index and project details remain available below.

Use the timeline or select a stage

Example project geometry. Design stages illustrate the proposal, not consent approval or actual construction progress. Room viewpoints are indicative; this is not a measured survey or an automatic drawing-to-model conversion.

Fig. 03Drawing set

Drawn from the project geometry · grids A–D, 1–7 · rev F

Lakeside Hall: ground floor plan on grids A to D and 1 to 7, 24 by 14 metres.ABCD1234567HALL224 m²STAGE AND STORE40 m²KITCHEN36 m²FOYER18 m²WCS18 m²80008000800024000 overall14000N0125mGROUND FLOOR PLAN · 1:100 AT A1
Project
Lakeside Hall
Project no.
LR-24-031
Sheet
A-101 Ground floor plan
Scale
1:100 at A1
Drawn by
LR (example)
Date
2026-10-22
Revision
F
Status
Example practice · demo data

Fig. 04Progress scan against design

Example deviations · drawn 40 times true size

Progress scan of the slab edge and frame against the design plan. Example deviations, drawn 40 times true size.

Points
102
Within 10 mm
80
Watch, to 25 mm
21
Outside
1 · max 30 mm

Drag the handle or use the arrow keys. Circles are within tolerance, diamonds are on watch, and filled marks are outside. Pai turns the outside points into a defects list for the architect.

Lakeside Hall: designABCD1234567HALL224 m²STAGE AND STORE40 m²KITCHEN36 m²FOYER18 m²WCS18 m²80008000800024000 overall14000N0125mGROUND FLOOR PLAN · 1:100 AT A1
Progress scan of Lakeside Hall: example deviations from the design at 102 points along the outer walls.ABCD1234567+30 mmPROGRESS SCAN · EXAMPLE DEVIATIONS ×40

Fig. 06Energy, modelled against target

May 2027 onwards · kWh/m² · Example

Modelled, 12 months
50.5 kWh/m²
Target, 12 months
50.8 kWh/m²
Against target
−0.6%
Months over target
4 of 12
Modelled energy use against target by month, May 2027 to Apr 2028. Modelled 50.5 against a target of 50.8 kWh/m². Example data. The table below has the same figures.0246MayJulSeptNovJanMarkWh/m²ModelledTarget
Modelled and target energy use by month, kWh/m². Example data.
MonthModelledTargetDifference
May 20275.25.0+0.2
Jun 20276.05.8+0.2
Jul 20276.36.0+0.3
Aug 20275.95.8+0.1
Sept 20274.84.9−0.1
Oct 20273.94.0−0.1
Nov 20273.23.4−0.2
Dec 20272.83.0−0.2
Jan 20282.62.8−0.2
Feb 20282.72.8−0.1
Mar 20283.13.2−0.1
Apr 20284.04.1−0.1

Fig. 07Fees and stages

Kaupapa · Example · shares of the agreed fee

Share of the agreed fee claimed so far · Example

83%

StageDeliverableShare of feeClaimedStatus
Pre-designBrief, site study, programme5%
100%
Claimed
Concept designOptions and a preferred concept10%
100%
Claimed
Preliminary designPlans, sections and an outline specification12%
100%
Claimed
Developed designCoordinated design with consultants18%
100%
Claimed
Detailed designConsent and construction set25%
100%
Claimed
ProcurementTender documents and tender review5%
100%
Claimed
Construction observationSite visits, RFIs, variations and claims20%
40%
In progress
CompletionPractical completion, defects and CCC support5%
0%
Not started

Stage names are the generic sequence New Zealand practices use. Shares and progress are Example figures; there are no prices on this page.

Fig. 08Site visit

Pai and Ārai · Draft awaiting approval

Voice memo · Example

3:56 recorded on the walk back to the car by the example project architect. Pai and Ārai turn it into the report on the right.

Hui records the memo · Pai drafts the report · Ārai adds the safety points

Site visit report · Lakeside Hall

Awaiting approval

5 Nov 2026 · Fine, light south-westerly

Progress

  • Portal frames 1 to 7 erected and braced
  • Purlins fixed on grids 1 to 4
  • Services block slab poured

Observations

A/1Frame base plate out by 28 mm against setout
Surveyor to confirm; engineer to advise before grouting · Main contractor
C/3Two bolts missing at knee connection
Install before purlins on grids 5 to 7 · Main contractor
D/2 to D/5Deck ledger penetration not yet detailed for the wider deck
Detail in the consent amendment set · Lantern Row (example)

Safety (Ārai)

  • Edge protection on the services block roof not yet up; asked the site manager about the date
  • Exclusion zone kept under the frame lift

Decisions

  • Hold grouting at A/1 until the engineer confirms
  • Deck amendment set to the engineer by Friday

Goes to Main contractor, Structural engineer, Example hall committee only after the project architect approves. Not sent.

Fig. 09Consultants

Kaupapa · Example

RoleWho (Example)StageNextBall in court
Structural engineerExample structural engineerConstructionAdvice on the A/1 base plate; PS1 for the deck framing receivedWaiting on them
Acoustic engineerExample acoustic consultantConstructionSend the revised ceiling layoutWaiting on us
Main contractorExample builderFrame upProgramme update after the glulam deliveryWaiting on them
Project managerExample PMConstructionMonthly report on the 28thNothing outstanding

Fig. 10Document register

Superseded revisions stay visible

SheetTitleRevStatusDate
A-101Ground floor planFFor construction22 Oct 2026
A-201Amendment: lake-side deck planBFor consent22 Oct 2026
A-215Amendment: deck ledger and cladding junctionAFor coordination4 Nov 2026
A-301Section B–B through hallEFor construction11 Aug 2026
S-04Specification section 04: deckBFor consent22 Oct 2026
A-101Ground floor planESuperseded30 Jun 2026

Fig. 11Programme

Example

  1. Jun 2024Brief with the hall committee
  2. Nov 2024Developed design
  3. Jul 2025Building consent granted
  4. Mar 2026On site
  5. Oct 2026Frame up
  6. Nov 2026Deck amendment to consent (now)
  7. Apr 2027Practical completion

Fig. 12Materials by embodied share

Example

  • Concrete slab and footings31%
  • Glulam portal frames18%
  • Roof cladding and purlins15%
  • Timber wall framing and linings13%
  • Glazing and frames9%
  • Insulation and membranes7%
  • Other7%

Fig. 13Site terrain

Real LINZ LiDAR · example site at a public place

The ground is real: LINZ’s 1 m elevation model at Rotorua lakefront, a public place used as the example site. No building is proposed there.

Studio tool: /lab/site, with rain to show where water runs and pools.

LINZ 1 m elevation · Rotorua lakefront

A 3D model of the real ground, with rain to show where water runs and pools. It downloads elevation tiles when it opens.

Open full screen

Fig. 14Lessons

Kept for the next project

  • Order the glulam frames at consent, not at tender: the lead time set the programme.
  • Get the hall committee to walk a full event through the plan before developed design is signed off.
  • Scan the slab before the frame goes up. One frame base was out by 28 mm and was caught before erection.

Fig. 15Credits

All Example

Architect
Lantern Row Architects (example)
Client
Example hall committee
Structural engineer
Example structural engineer
Acoustic engineer
Example acoustic consultant
Main contractor
Example builder
Project manager
Example PM